Completed Projects Update: Week 9
* move into house
A while back I made some wreaths for this house. I placed one on our front door to add color to the entry :)
* update kitchen
The floors, counters, and cabinets are done!
Sunday: David secured the dishwasher in place (after the new counters were installed we needed to re-secure the dishwasher to the counters)
Thursday: I found drip pans that fit our stove top... this house had a few quirks for us to fix; for example, the stove was without drip pans and the oven was without racks. Anyhow, it took a couple of trips and mix-matching brands, but the stove now has drip pans that fit--which certainly makes cooking on it much easier :)
Friday: I picked up some more samples for possible back-splashes; it's proved more challenging to select a back-splash than I had originally thought. But I think we are finally heading in the right direction/near a selection :)

Saturday: David installed one of the drawer pulls. Our drawer pulls are a different size than the original ones so he is drilling new holes and then having to fill the old hole and touch up the paint.


* update bathrooms (refinish walls, replace toilets, fixtures and faucets)
Sunday: David secured the dishwasher in place (after the new counters were installed we needed to re-secure the dishwasher to the counters)
Thursday: I found drip pans that fit our stove top... this house had a few quirks for us to fix; for example, the stove was without drip pans and the oven was without racks. Anyhow, it took a couple of trips and mix-matching brands, but the stove now has drip pans that fit--which certainly makes cooking on it much easier :)
Monday: David finished installing the faucet and water temperature handles for our shower.
* remove wood paneling in entry and family room
Done!
Done!
* re-texture paneled walls
Done!* paint trim (crown molding, baseboards, door trim) throughout house
no new progress* add a privacy fence to the west side of property
David planned to work on this project over the weekend but has decided to start it during the upcoming week. This is one of the last few larger projects for him (in addition to re-finishing the walls in the guest bathroom and remodeling the laundry room).
* clean-up landscaping
Done!
* purchase/make window treatments
* purchase/make window treatments
Sunday: David hung curtain rods in the dining room!
Sunday: we set up the tables in the breakfast nook and dinning room!!! And, I found a rug at Lowe's that may be the perfect jumping off point for our family room decor.
Sunday: David assembled the pack-n-play and I unpacked toys, removed tags and started setting up the nursery.
Wednesday: I've made great progress on the nursery! Other than sewing the drapes and completing some crafts it is ready for our little Peanut!
Both David and I had yellow nurseries...
a bird house my Grandpa Dick made for me when I was little
We are 38 weeks and excited about our bundle of joy's arrival! Even if the house is still in the works- the nursery is ready :)
Thursday/Friday/Saturday: Each day I have started (and completed some) of the decorations for the nursery! I will post pics when they are finished and displayed in the baby's room :)))
Monday: David hauled off the 2nd load of remodeling-trash to the dump.
Tuesday: David hauled off the 3rd load to the dump; only 1 load remains.
It started as a big stack of trash...
Saturday: David moved the seasonal decor tubs into the attic and reorganized the garage to allow room for my car.
* 3 sweet surprises
1) Our dishwasher operates quietly! The apartment dishwasher was a bit loud, so this is an unexpected improvement!
2) Two of the bushes we planted in the front yard have grown pretty purple blooms that I did not know about when purchasing the bush!
Last week I dined at Artisan Bistro--a french restaurant for lunch with some friends. It was mighty tasty!!! It's in the Lakeway area of Austin and you should check them out!
No comments:
Post a Comment